A metal gate contractor in Round Rock builds, hangs and repairs steel, wrought iron and aluminum gates for driveways, side yards and property lines, and most of the work comes down to how the gate meets the ground. Williamson County sits on expansive clay soil, so a gate that opens cleanly in a dry August can bind against its latch after a wet spring.

What the work starts with

The job starts with measuring the opening, reading the slope of the driveway and checking what sits in the swing path. Sprinkler heads, mailbox posts and tree roots near Brushy Creek all show up in that walk. Only after that do the posts, the frame and the finish get chosen, because each one depends on the others.

Posts, frames and finishes

Posts carry the whole gate, so they are set deep and wide in concrete that spreads the load across the clay. Frames are welded from steel tubing or solid bar, and the welds decide whether a leaf stays square for years. Finishes range from zinc primer with brush paint to baked powder coat, and the Central Texas sun is hard on all of them.

Swing, slide and operator choices

Swing gates suit level drives with room behind the opening. Slide and cantilever gates suit lots near Interstate 35 or Forest Creek where the ground rises toward the house or the fence line leaves no space to swing. An automatic operator adds a motor that needs rigid posts and a gate that does not sag.

Guides

The pages here cover footing depth in clay, steel against wrought iron, driveway width and swing, rust protection, sliding gate tracks and the checks a contractor makes before building. The posts add longer reads on sagging leaves and on preparing a Round Rock driveway for a new gate.

Latest Guides

Preparing a Round Rock Driveway for a New Metal Gate

2026-11-08

What should be done before any gate work begins?

Before any gate work begins, the owner should settle where the gate will sit, clear the opening and mark what lies underground. A gate built across the wrong line, or into a buried pipe, costs days to undo. In Round Rock, TX the work is made easier by one habit: walk the opening with a tape measure and a notepad a week before the crew arrives, and write down everything that could be in the way.

The steps below follow the order a careful crew works in. Skipping ahead is how a gate ends up an inch short of its post or a hinge ends up over a sprinkler line.

Where exactly does the gate go?

The gate goes on a line the owner can prove belongs to the property. Williamson County lots often have a recorded plat, and many subdivisions around Forest Creek and Brushy Creek also carry easements that run along the front or side of the lot. A gate set inside an easement can be ordered out later, so the plat and any survey should be pulled out and read before a post hole is marked.

Mark the corners of the opening with stakes and string. Step back to the street and look at the line as a driver would. A gate that sits flush with the front of the house reads very differently from one pushed back thirty feet, and the choice changes how a car needs to approach.

What has to be cleared from the opening?

Everything that stands in the swing path, the track path or the post locations has to move. The common offenders are listed below, along with what usually needs to happen to each.

Item in the wayWhy it mattersUsual solution
Sprinkler heads and linesPosts and tracks cut them, and spray soaks the footingCap and reroute away from the gate line
Mailbox postBlocks the arc of a swing leafMove it or choose a slide gate
Tree rootsBlock post holes and lift pavementShift the post location, never cut a large root without advice
Landscape lightingWires lie shallow near drivewaysMark the run and keep post holes clear of it
Loose gravel and mulchJams tracks and hides the true gradeRake back to bare ground along the gate line

How are buried lines located?

Buried lines are located by calling the Texas utility locating service before anyone digs. Gas, water, electric and communication lines all run near driveways, and a post hole auger can cut through any of them in seconds. The locating crews mark each line with paint or flags, and those marks need to stay visible until the posts are set. Irrigation lines are not covered by the public service, so the owner has to know where those run, which is easier with the original installation drawings or a quick look at where each sprinkler head sits.

What does the slope of the driveway change?

The slope of the driveway decides whether the gate can swing, and in which direction. Lay a long straight board across the opening and set a level on it. If the ground rises toward the house, a leaf swinging inward has to lift or the bottom rail has to be cut on an angle to follow the grade. If the ground falls toward the street, the same gate swings freely but may need a stop to keep it from drifting open.

Many driveways in the area have a crown in the middle and fall away to each side, which makes a long single leaf awkward. A pair of shorter leaves, each hinged to its own post, copes with a crown far better. A slide or cantilever gate sidesteps the issue and rolls along the contour.

How does the soil affect the plan?

The soil affects the plan because every post depends on it. Expansive clay soil swells with water and shrinks as it dries, and it can move a footing that was set too shallow. The owner cannot change the clay, but can help the footing by keeping downspouts and sprinkler spray away from the post locations. Soil that stays at a steady moisture level moves less.

Before the crew arrives, take note of where water runs after a storm. A low corner that holds water for a day is a poor place for a post, or at least a place where the concrete collar should be sloped away so the water leaves. A short walk after the next rain tells more than any guess.

Which rules need checking first?

Three sets of rules need checking first. A homeowners association may set limits on gate height, color, material and how far the gate sits from the street. The city may cap fence and gate height near a corner so drivers can see oncoming traffic. And the plat may restrict what is allowed inside an easement. Reading these takes an hour and can prevent a rebuilt gate.

If the neighborhood has an architectural review process, the application usually asks for a sketch, a material and a color. Having a rough drawing ready, with the opening width and the post positions marked, speeds the approval along.

What decisions should the owner make in advance?

The owner should decide on the operation, the material and the finish before the crew shows up, because each one changes the posts. The list below sets out the questions a crew will ask on the first visit.

  • Will the gate swing, slide or roll on a cantilever frame?
  • Will it open by hand or by a motor, and where would the power and the control wiring run?
  • Steel tubing, solid bar or aluminum, and how heavy a leaf can the posts carry?
  • Powder coat or brush paint, and which color suits the house and the neighborhood rules?
  • Should there be a pedestrian gate beside the driveway gate?
  • Who needs to open it: family, delivery drivers, a trash service?

A motor changes the plan the most. Power has to reach the post, usually through a conduit buried in a trench, and the operator needs a rigid mounting point. Deciding that early lets the crew run the conduit before the concrete goes in, which is far simpler than cutting it afterward.

What happens on the day the posts go in?

On the day the posts go in, the crew confirms the stakes, digs the holes below the clay's active zone and sets each post plumb in concrete. The holes are wide, often a foot or more across, and the bottoms are flared so the clay cannot lift the footing. The concrete then needs time to cure, and the gate is not hung until it has. That wait is the part owners find hard, but a post loaded too early will settle out of plumb.

Owners can help by keeping the driveway clear of cars, pets and children, by making sure the crew has water access for mixing, and by staying away from the open holes. A fenced hole is a safe hole.

What should be checked once the gate is hung?

Once the gate is hung, the owner should open and close it several times and watch the latch. The leaf should swing without scraping, stop where it should and latch without lifting or pushing. Check the gap at the latch top and bottom, and compare the two numbers. Look at each weld and each hinge for gaps or bare metal where the finish is thin.

Write down the measurements and keep them. A year later, after a wet spring and a dry summer, measure again. If the numbers match, the posts are staying put. If they do not, the early record shows exactly when and how much the gate moved, and that makes a repair easier to diagnose.

A short checklist to finish

Prepare the line, clear the opening, locate every buried utility, measure the slope, read the neighborhood rules, decide how the gate will operate and keep water away from the posts. Seven small jobs, done in order, make the gate itself go in smoothly.

Read more →

Why a Metal Gate Sags and How It Gets Fixed in Round Rock

2026-11-08

Why does a metal gate sag?

A metal gate sags because the hinge side drops, and the hinge side drops because the post, the hinge or the frame gave way under a load it was never built to carry. The leaf itself is rarely bent. In Round Rock, TX the most common cause sits below the ground, where expansive clay soil has moved the footing, but hardware and welds fail often enough that all three deserve a look before anyone reaches for a wrench.

A gate is a lever. The latch end of the leaf hangs several feet away from the hinges, so the weight of the whole frame pulls down on the lower hinge and out on the upper one. A leaf that weighs as much as a grown adult can load the top hinge with several times that force. Everything that follows comes from that one fact.

How do you tell which part has failed?

You tell by watching the gate move and measuring from fixed points. Stand back from the opening and look at the gap between the leaf and the latch post at the top and at the bottom. A gap that is wider at the top than the bottom means the latch end has dropped. Then hold a level on the hinge post. If the bubble shows the post leaning toward the driveway, the footing has moved. If the post is plumb and the leaf still hangs low, the problem is in the hinges or the frame.

Reading the post

A post that leans is almost always a footing problem. Check the ground around it for a crack that opens in dry weather and closes after rain, a gap between the concrete collar and the soil, or a collar that has lifted slightly out of the ground. Any of these points to clay moving around a footing that is too shallow or too narrow.

Reading the hinges

Lift the latch end of the leaf by hand and feel for play. A hinge with a worn pin or a loose bolt clunks as the leaf rises and settles. Look at where each hinge is welded or bolted to the post: a hairline crack in the weld or a bright line of rust at the edge of a bolt plate shows that the joint has been working loose for some time.

Reading the frame

Measure the diagonals of the frame from corner to corner. When the two measurements differ, the frame has racked into a parallelogram. That usually comes from welds that were tacked rather than run along the full joint, or from a leaf that was hung with no diagonal brace.

What repairs hold up in clay?

Repairs hold when they remove the cause rather than the symptom. Raising the latch end with a shim or tightening a hinge may close the gap for a month, and then the post moves again. A lasting fix depends on which part failed.

When the footing moved

A leaning post gets reset. The old concrete is broken out, a deeper and wider hole is dug below the zone where clay swells and shrinks, and the post is set plumb in a footing that flares at the bottom so the clay cannot lift it. Some contractors add a gravel layer under the concrete for drainage. The gate is rehung only after the concrete has cured fully, which takes days, not hours.

When the hinges wore out

Worn hinges are replaced with a heavier pair, and the upper hinge is set to take the outward pull. Adjustable hinges let the contractor dial the leaf back to level without cutting anything. A greased pin and a washer between the knuckles cut friction, and a hinge that turns freely is a hinge that lasts. Welding a new hinge plate to a rusted post is a poor repair, because the weld sits on weak metal.

When the frame racked

A racked frame is pulled square and braced. A diagonal brace running from the bottom of the hinge side up to the top of the latch side puts the brace in tension, which is exactly what a thin steel bar handles well. Where the welds have cracked, the joint is ground back to clean metal and welded again along its full length. A frame that has twisted and kinked at a corner is cheaper to rebuild than to straighten.

Does an automatic operator make sagging worse?

An automatic operator makes a sag worse because the motor keeps pushing a leaf that is binding. A hand-swung gate that drags on the pavement tells the owner at once. A motorized gate just strains, and the operator arm, the hinge and the post all absorb the extra force. When a gate with an operator starts to groan or to stop short of the latch, the first move is to disconnect the arm and swing the leaf by hand. If it moves freely, the operator is the problem. If it drags, the gate needs repair before the motor goes back on.

Which conditions around Round Rock cause the most trouble?

The conditions that cause the most trouble are wet winters, dry summers and water that collects at the post. Clay around Brushy Creek and in neighborhoods like Forest Creek takes on water quickly and gives it back slowly, so the footing sees a large swing in soil moisture every year. A downspout or a sprinkler that soaks the same patch of ground each morning widens that swing and speeds up the movement.

Sloped lots add a second problem. Runoff crossing a driveway opening carries silt against the post and keeps the clay at its base damp long after the lawn has dried. Grading the soil to drain away from the footing and moving a sprinkler head a few feet back can do more for a gate than a new hinge.

Heat matters too. Steel left in direct afternoon sun expands, and a latch that closes easily in the morning can bind by three in the afternoon. That is not sagging, but owners often mistake one for the other. Checking the gate at two different times of day sorts the two apart.

What can an owner check without tools?

An owner can check three things with nothing more than a level, a tape and a few minutes. First, measure the gap at the latch top and bottom and write the numbers down. Second, hold the level against the hinge post on two faces and note any lean. Third, swing the gate slowly and watch for a spot where it scrapes, rubs or jumps.

Repeating those measurements after a heavy rain and again after a dry spell shows whether the post is moving with the seasons. A post that moves a quarter inch between wet and dry is not settling, it is cycling, and it will keep cycling until the footing is rebuilt.

How long does a repair last when it is done right?

A repair done right lasts for the life of the gate. Posts set deep in a flared footing, hinges sized for the leaf and a braced frame stay put through wet and dry years alike. The repairs that fail are the quick ones: a shim, a longer bolt, a coat of paint over a cracked weld. Each hides the cause and lets it continue.

The right order is to fix the ground and the post first, then the hinges, then the frame, and finally the finish. Doing it in reverse means paying for hardware and paint twice.

What does a good repair visit look like?

A good visit begins with measuring, not with tools. The contractor checks the plumb of the post, the gap at the latch, the diagonals of the frame and the condition of each weld, and then explains which part failed and why. A repair plan that names the cause is one worth trusting. A plan that only says the gate needs adjusting is usually a plan to return in a few months.

Read more →